CENTER FOR CONSTRUCTION QUALITY INSPECTION AND TESTING
(Issued with Decision No. 01147/QD-UBND dated September 3, 2025
of the People's Committee of Dak Lak province)
Article 1. Position and functions
1. The Center for Construction Quality Inspection and Testing (hereinafter referred to as the Center) is a public service unit under the Department of Construction, self-sufficient in operating expenses; has legal status, its own account and its own seal, arranged for use at each working facility , under the direct and comprehensive direction and management of the Department of Construction, and is responsible to the Director of the Department and the law in the process of performing its tasks .
2. The Center has the function of performing construction quality appraisal; judicial appraisal in construction activities according to the provisions of law and providing construction consulting, testing and inspection services according to assigned functions, serving the state management of the construction sector and at the request of organizations and individuals.
Article 2. Duties and powers
1. Forensic appraisal of civil and industrial construction cases in Dak Lak province:
- Comply with legal regulations in construction investment activities.
- Construction design quality.
- Quality of construction components, construction works and construction incidents.
- Construction investment costs, project value and other related costs.
2. Construction specialized testing; testing the quality of construction materials, components, and products; inspecting the quality of construction components, construction items, and the entire construction.
3. Control experiments during construction; testing, checking, determining technical indicators of semi-products, components, construction parts, and construction items to serve acceptance work.
4. Construction inspection, testing of the bearing capacity of construction structures as required by competent authorities for inspection and acceptance work; when the construction has expired its design life but the construction owner wants to continue using it; when the construction in operation or use shows signs of danger or does not ensure safety; construction inspection of construction works to serve maintenance work.
5. Inspect and evaluate the quality of works in use that need repair, expansion, renovation, upgrading, demolition or have incidents and construction works before being put into use.
6. Construction safety assessment.
7. Check the acceptance work during construction and upon completion of construction.
8. Consulting on task establishment, technical plan for construction survey, design task establishment; conducting construction survey, construction survey supervision.
9. Consulting on preparation of Construction Investment Feasibility Study Report or Construction Investment Economic-Technical Report; Consulting on construction design; Consulting on construction investment cost management.
10. Reviewing the Construction Investment Feasibility Study Report or the Construction Investment Economic-Technical Report; reviewing construction design and construction estimates.
11. Consulting and supervising construction of civil, industrial, traffic, road and bridge, irrigation, technical infrastructure works, and supervising equipment installation.
12. Measure and extract home ownership records of organizations and individuals.
13. Project management consulting for construction projects.
14. Bidding consultancy.
15. Urban planning and rural planning.
16. Research and design of civil and industrial houses.
17. Participate in research and application of scientific and technological advances in construction and building materials.
18. Coordinate the opening of training and professional development courses within the functions and tasks of the Center and in accordance with the provisions of law.
Article 3. Organizational structure and number of employees
1. Center Leadership: Director and no more than 03 Deputy Directors.
The Director is the head of the Center, responsible to the Director of the Department of Construction and the law for all activities of the Center.
The Deputy Director of the Center is the person who assists the Director of the Center in charge of a number of areas of work; is responsible to the Director of the Center and before the law for assigned tasks.
The appointment, dismissal, removal, resignation, commendation, discipline, rotation, implementation of regimes and policies for the positions of Director and Deputy Director of the Center are carried out according to the province's cadre management decentralization and regulations of law.
2. Functional rooms
- General Administration Department;
- Construction specialized testing and inspection laboratory;
- Construction Appraisal Department.
3. Number of employees
The number of employees of the Center according to the plan is built and proposed annually by the Center and approved by competent authorities.
The management, determination of job positions and number of employees; recruitment, arrangement, use and management of civil servants and employees of the unit must be based on the functions, tasks, workload, nature and characteristics, job positions, professional title standards, civil servant rank structure according to the province's cadre management hierarchy and regulations of law.